HZJS-III 10kv 12kv Tan Delta and Capacitance Tangent Dielectric Dispassion Factor Tester
起源の場所:湖北省武漢市
ブランド名:HZRTZ POWER
証明:GB/T19001-2016 idt ISO 9001:2015
モデル番号:HZJS-III
最小注文数量:1
価格:USD 1,000 - 10,000
パッケージの詳細:IPPC 燻蒸木箱 (lSPM15)
受渡し時間:5~7営業日
支払条件:T/T
今すぐ問い合わせる
引用を得なさい
仕様
注目すべき 特徴
25.75kg power transformer test set
,
digital power transformer test set
,
25.75kg power transformer testing equipment
型番:
HZJS-III
表示タイプ:
デジタルのみ
画面:
液晶
寸法:
400*290*330mm
重さ:
25.75kg
電源:
AC 220V
製品の説明
Product Overview The HZJS-III Anti-interference Different Frequency Dielectric Loss Tester adopts frequency conversion power supply technology, utilizing micro-controllers and electronic technology for automatic frequency conversion, analog-to-digital conversion, and data computation. This results in strong anti-interference capability, fast testing speed, high accuracy, and easy operation. The frequency conversion power supply uses a high-power switching power supply,
Key Advantages Resists high heat, humidity & salt spray — ideal for tropical island use Stable operation at -40°C — cold-proof and anti-condensation IEC compliant — complete calibration certificates provided Local support — spares, on-site training & instrument calibration Product Description The ...
Product Overview The HZP-10A is a 10A three-phase power transformer winding DC resistance tester designed for accurate, reliable field and factory testing. It combines high output current with a lightweight, battery-powered design, making it suitable for transformer manufacturing, installation, ...
Product Overview The HZS-20A is a three-channel DC resistance tester designed for measuring transformer winding resistance. It delivers fast, accurate readings across a wide measurement range and is built to perform reliably in demanding field and laboratory environments. Resists high heat, humidity...
Product Overview The HZBB-II Transformer Turns Ratio Tester is a low-cost, high-performance instrument designed for measuring the turns ratio and voltage ratio of power transformers. During the production of semi-finished and finished power transformers, before new transformers are put into ...